Item PRT Urban Metro BUS TAXI
HRT LRT
Operation

Networked & Offline System
(Nonstop Trip on Demand

Line-haul System
(Stop at every stop on the pre-defined route)
Nonstop Trip on Demand
Station Spacing 200m 1,000m 800m 200m
Service Area Meshed Network Line haul Line haul Line haul No limits
Average
Trip Speed
45~60km/h 25~35km/h 25~35km/h 15~20km/h 30km/h
Headway 2.5 sec 2-5 min 1-2 min 5 min
Construction Cost 11M USD/km 100M USD/km 60M USD/km
Operation Staffs Unmanned Operation

Drivers
Security Staffs

Drivers
Security Staffs
Driver

Drivers
Booking Staffs

Operation Time 24/7 Limited Limited Limited

24/7(Extra charge)

Service Charge cheap cheap cheap cheap expensive
Quality of Service Premium Nominal Nominal Nominal Premium